Turn material, labor and overhead into a target selling price and optional card total.
A 35% markup on cost does not equal a 35% gross margin. This calculator shows both so a quote is easier to sanity-check.
Material, freight, consumables, cutting, labor, shop overhead and any subcontract work should be considered before applying a markup.
Relevant products are pulled from one central catalog so this site does not need page-by-page affiliate-link maintenance.