Frequently asked questions
Is this a quoting calculator?
It is a planning calculator. Your actual quote should include the real scope, risk, setup, travel, finishing, tax and contract terms.
Does welding time equal total labor time?
No. Layout, fit-up, cutting, grinding, handling, cleanup and inspection can exceed arc time.
What belongs in overhead?
Shop rent, utilities, insurance, consumable loss, admin and other operating costs that are not already entered directly.